While we've been researching ideas for our single, music video cover, Spencer has been designing the outlines of the digipack. This included a sort of prototype for the front and back of the CD case, and with this we've got an insight to what it'll look like with the photographs and text in place.
Wednesday, 30 November 2016
Tuesday, 29 November 2016
TEAM PROGRESS - Creating our Pitch
After discussing our choices for what CD covers we should take inspiration from, we've created a presentation on Google Slides. with this, our pitch will consist of the CD covers we've looked into and have short descriptions beside them, connoting how and why it relates to our work as well as their features. This is my part of the Pitch:
Monday, 28 November 2016
TEAM PROGRESS - Researching CD Covers
Completing the Music Video we've gone to the stage of presenting the actual, physical CD as well as the case for it. We'll be creating graphic art and for this we started doing our research on what artists and covers we should take inspiration from.
Saturday, 26 November 2016
Friday, 25 November 2016
ROUGH CUT with Feedback
A preview to the final outcome, the video is in full length however the editing is minimal and was rendered out from Premier Pro. We'll be finishing and adding in the final details to the video before next Friday.
This is the Feedback we got for the rough cut; receiving positive reviews as of our techniques used in the editing as well as the whole look and feel of the video. It helped us out because the reviewers are of the same age and experience and getting some recommendations such as making the cutting more consistent was useful to our final outcome.
Wednesday, 23 November 2016
Post-Production: Week 3 - Editing
Coming close to the end of our editing schedule, we've started to add on effects with the use of adjustment layers as well as Adobe After Effects. With these two we are able to enhance the look of individual clips with the use of tools in the software; including the RGB (Red, Green and Blue) levels and curves.
Monday, 14 November 2016
Post-Production: Week 2 - Editing
Continuing on with Premier Pro, we've taken turns on the seat to contribute with the editing of the music video. Progress has been going well and we've reached the halfway point; using other software such as After Effects for stabilization it has also helped enhance some of our video clips.
Tuesday, 8 November 2016
Post-Production: Week 1 - Editing
After gathering all of our clips from filming, we've gone into the stage where we have to combine them and sync it with the track. This is done on Premiere Pro from the Adobe suite, where it enables us to professionally edit our music video on the Apple iMacs.
Wednesday, 2 November 2016
FILMING: Day 5 - Film Studio
For our final shoot, we booked a session in the studio to film for what we planned as a part of the intro of the music video. This consisted of the whole group as well as an additional of 2 others to gather round for the 'therapy meeting' with me as the therapist and the rest as my clients; whilst one recorded on the DSLR.
It went according to plan and because of the capabilities of the studio we were able to have an advantage over the controls to fine tune the lighting to get what we visualized on.
Tuesday, 1 November 2016
FILMING: Day 4 - National Theater
Continuing on with our film schedules, our next location was at the National Theater where we wanted an urban setting which included some iconic landmarks around London. This included the London Eye, the London Bridge and also the theater itself as well as some of the buses going by for our time lapse. The session went well and we were able to capture our shots even though it was rather cloudy, which just adds on to the effect.
FILMING: Day 3 - Leake Street revisit
Having to record more footage at our first location, we headed back to Leake Street to get more shots according to the rest of the storyboard. This time we were able to stay around longer and get better lighting as of the daylight in the early afternoon.
Subscribe to:
Posts (Atom)